Divine Mercy Project


I-80 Stockton Iowa Exit


Divine-Mercy-Image-with-Height-25-Oct-2026.png


We are all on a mission from God! 

Rarely Jesus directly requests us to produce a material object. When He desires anything of us, we should respond. We have the opportunity participate in His request. 

Our project is to erect one of the largest Divine Mercy Image's in the United States and maybe the world. (18 ft. x 33 ft plus a prayer banner sign on top of the Image)

There are a large number of the travelers that are experiencing despair, pain, suffering, and broken relationships. This Image will be a vessel of hope and a spiritual conduit for the Holy Spirit to strike them in their heart.


The Divine Mercy Image is a depiction of Jesus based on the devotion initiated by Saint Faustina Kowalska. 

On February 22nd, 1931, Jesus appeared to her with rays radiating from His heart and said: “Paint an Image according to the pattern you see, with the signature: Jesus I Trust in You. I desire that this Image be venerated, first in your chapel, and throughout the world.” (Diary 47)



 

Learn more on the project

Listen to interviews on the development of this project and why are we doing this sign.  Hear from Fr. Peter Zorjan on his insights on Divine Mercy.

Click button below to hear the stories



Check out Drew Mariani's discussion with  Dr. Ralph Martin discussing the end times and how the Divine Mercy fits into the plan Jesus has for us. 


“Do whatever is within your power to spread devotion to My mercy. I will make up for what you lack. Tell aching mankind to snuggle close to My Merciful Heart, and I will fill it with peace.” 

(Diary 1074) 

~ St. Faustina Kowalska




DivineMercyI80_traffic.png


Statistics of I-80 Traffic

  • Average of 1.5 persons 18+ years of age per vehicle
  • 37,494 vehicles per day
  • 1,124,820 vehicles per month
  • 13,685,310 vehicles per year
  • 20,527,965 annual impressions





DivineMercyI80_GoalsRaised.png


  • Scott Seele – Iowa City – 563-343-7297
  • Mike Schulte – Cedar Rapids – 319-929-5238
  • Brian Porter – Quad Cities – 608-904-2790
  • Greg Hansen – Quad Cities – 563-343-2338 


About The Project

501c3 organization, donations to Divine Mercy Project are tax deductible to the extent allowed by the IRS.

Davenport Salvation Radio

Tax ID # 81-0575080

Completely Trust in Jesus: 

God wants us to know that the graces of His Mercy are dependent upon our Trust. The more we Trust in Jesus, the more we will receive 



Donate by Mailing a Check to:

Divine Mercy Project

PO Box 321

Eldridge Iowa 52756-9998

 

Make checks payable to:

 Divine Mercy Project

 


Other Ways to Donate 

DivineMercyI80_QRcode.png



WHAT'S NEXT?



DivineMercyI80_icons.png

STRUCTURE DESTRUCTION

Prepare and demolish current site
Cost: $26,000.00

Completed August 2026



DivineMercyI80_icons.png

ELECTRICAL & LIGHTING

Cost: $23,000.00



DivineMercyI80_icons.png

SIGN/LAND LEASE: 

Donated by Teo's Towing Service, located just off I-80 near Stockton, Iowa

Completed October 2026

DivineMercyI80_icons.png

Sign Frame

Design, Engineering, Manufacturing two Jesus Images & box frame.  Installation: $98,000

In progress - Installation estimated November 2026



DivineMercyI80_icons.png

Sign Frame

Design, Engineering, Manufacturing two Jesus "Jesus, I Trust in You" Images (east/west)
Installation: $152,000.00


DivineMercyI80_icons.png

OPERATIONS FUND:

Cost: $16,000.00



Follow Our Progress!



Lighting Plan

10/22/2026

We have completed the electrical plan. The lights will be placed in five different locations for each of the east and west facing images. The lights are positioned to emphasis the features of the image. We have have the ability to adjust the intensity of each light in the field. The study shows the brightness on the image of the 33' x 18' panel.

Progress Update

09/14/2026

The sign is now ready to install the new 18 foot x 33 foot structures facing both east and west.  Exciting!

read more

The first Phase is complete - Old sign removal

09/09/2026

Seither and Cherry Inc. was contracted to bring in a 65 ton crane and extra long elevation work platforms to remove the old signage. It took two days for the crew to get the removal work done.